Recent Case Studies

  • Repair to retaining wall using the Heli Pile

    The horizontal mortar joints were cut out 10mm wide and 65mm deep, using a mortar raking machine fitted with a dust extraction system, at 450mm centres over the height of the wall.
    Two 6mm continuous stainless steel helical bars were inserted into the pre-cut joints with cementous non-shrink pump able grout.
    At the points where the stud from the pile protruded, 6mm stainless steel helical bar were placed either side. A large stainless steel washer and nut clamped the helical bar to the pile and ...

    Click Here
  • Cropwell Bishop Structural Helifix Repair

    Cropwell Bishop Structural Helifix Repair

    resin brick repair mortar tinting.

    Click Here
  • The Spires Chesterfield

    The Spires Chesterfield

    Replaced the existing steelworks with new parallel flange channel prop existing structure with the slim shore system.
    To remove existing steel that was undersized. Prop existing building with slim shore canterlivered props and fit new correct size steel remove propping system and brickup

    Click Here
  • Widney Road

    Widney Road

    Here is another example of one of our previously completed structural reinforcement projects that we carried out.

    Click Here
  • Whetstone Lane, Aldridge, West Midlands

    Whetstone Lane, Aldridge, West Midlands

    Here is another example of one of our previously completed structural reinforcement projects that we carried out in Aldridge.

    Click Here
  • The Lings Doncaster

    The Lings Doncaster

    Here is another example of one of our previously completed structural reinforcement projects that we carried out in Doncaster.

    Click Here
  • Peak Court - Bed Joint Reinforcement

    Peak Court - Bed Joint Reinforcement

    Masonry reinforcement in the form of Helifix 80 304 austenitic stainless steel helical bar at 150mm vertical centers ( Standard detail PW02) Prior to be pressure grouted with cementitious thixotropic grout, curing to 60N/mm2. Reinforcement taken down to corbelling. All reinforcement bars extended to a minimum of 500mm past any defective brickwork.All works carried out in strict accordance with manufactures instructions.
    Any fractures in brickwork internally and externally are stabilized with hel...

    Click Here
  • New Coventry Road

    New Coventry Road

    Structural repairs - Before/After
    (NOTE: Mortat is still drying out)

    Click Here
  • Berry Close

    Berry Close

    Re-pointing of side elevation due to shrinkage of new mortar. (Please note that mortar will dry to match existing colour.)

    Click Here
  • Berry Close ELY

    Berry Close ELY

    Here is another example of one of our previously completed structural reinforcement projects that we carried out. 

    Click Here
  • Pharmacy at High Street: Helifix repair to quoins

    Pharmacy at High Street: Helifix repair to quoins

    1. 18mm diameter holes drilled to specified depth
    2. Holes flushed with water.
    3. Cemties ready to be grouted in.
    4. Drill holes made good with stone mortar.
    5. Quoins repointed Rainwater goods reinstalled.

    Click Here
  • The Ernest Cook Trust

    The Ernest Cook Trust

    Due to ground movements and other stresses on the building, the masonry walls had cracked. We repaired and stabilised the masonry walls ensuring the building is safe and secure.

    Click Here